The worker guys were here yesterday. The toilet was turned, the studs for the alcove erected, the light/fan switch moved, and the door will swing the other way. I went ahead and bought the sink, so that was there to provide reference, and the plumber offered to hang it as well as attach the legs, to make it extra sturdy.
Today the electrical inspector came and - YAY - we passed. Whew! Tomorrow the framing inspector is supposed to do his thing. Then we will be ready for insulation and drywall. Knock on wood.
Christmas catalogs have started to arrive. Can seed catalogs be far behind?
No comments:
Post a Comment